Auchencarroch Waste Station

Client:
Barr Environmental

Design & build:
3b construction

Contractor:
3b construction

Contract Value:
£750,000

3b construction have been awarded the contract for the construction of a new waste recycling station at Auchencarroch landfill site for Barr Environmental. This project will allow Barr Environmental to help local authorities meet their statutory landfill diversion and recycling targets and is part of their overall environmental investment programme.

The project was completed over 4 months and involved driven concrete piles, pile caps and ground beams, steel framed building, precast and reinforced concrete retaining walls, structural floor slabs, drainage works and specialist plant and machinery inside the building.

« back to industrial