Plant Expansion for Land Energy

[slideshow type=”nivo” number=”4″ source=”{g}” width=”628″ height=”418″ effects=”fade” directionNav=”false” directionNavHide=”false” controlNav=”false” align=”center”]
https://www.3bconstruction.co.uk/news/wp-content/uploads/2016/06/land-energy.jpg
https://www.3bconstruction.co.uk/news/wp-content/uploads/2016/06/land-energy-2.jpg
https://www.3bconstruction.co.uk/news/wp-content/uploads/2016/06/land-energy-3.jpg
https://www.3bconstruction.co.uk/news/wp-content/uploads/2016/06/land-energy-4.jpg
[/slideshow]

3b crane hire are working together with Land Energy during their shut down period installing new plant and equipment as part of their plant expansion works. 3b crane hire have supplied various sizes of cranes to the project along with Appointed Persons, Lift Supervisors and Slinger/Signallers to ensure a smooth installation of the new equipment.

3b construction have been working on site for the past 8 months carrying out reinforced concrete works as part of a design and build contract in preparation for the new equipment to be installed during this shut down period. In the background can be seen one of the bases for the new pellet storage silos ready for concrete to be poured.

This ambitious expansion plan by Land Energy at their Girvan based pelleting facility will see an increase in plant production of 50%, helping to keep up with demand for their high quality pellets.