4th October 2019
Our construction, crane hire and transport divisions have been working together over the last few weeks to deliver and install 64 large pieces of precast concrete, each weighing up to 19 tonnes, on our construction project, near Humbie, Edinburgh. A total of 45 artic loads are being delivered and installed over a 3 week period.
The project consists of 24,000m2 of heavy duty concrete log yard extension, all RC works associated with the construction of a new log sorter including 3 storey control building along with a new dropsorter building, chip bay extension building, HV/LV switchroom buildings etc.